Chandrayaan-1

Launch: October 22, 2008             Site: Satish Dhavan Space Centre, Sriharikota

The objectives of the programme were:

  1. To develop and orbit a spacecraft around moon using an Indian-made launch vehicle.
  2. To prepare a three-dimensional atlas of both the near and the far side of the moon.
  3. Chemical and mineralogical mapping of the entire lunar surface.
  4. To study the impact of Moon Impact Probe on the surface of the moon as a fore-runner to future soft landing missions.

NASA’s Moon Mineralogy Mapper (M3) had on Chandrayaan-1 had detected water on the surface of moon. The mission was expected to last two years. However, the communication with the satellite was lost on 29 August 2009 and the mission was declared over. It lasted for 312 days and achieved 95 percent of its objectives.

Chandrayaan-1 was selected by the American Institute of Aeronautics and Astronautics (AIAA) as one of the recipients of its annual AIAA SPACE 2009 awards for contributions to space science and technology.

IMPORTANT NOTE

SSCMASTERS will come out with more such initiatives to provide a level-playing field to aspirants who do not need or have access to coaching and provide strategic competitive advantage to our followers in every aspect of SSC preparation and to stand true to its endeavour of becoming ‘A One stop Destination for SSC preparation’. Please Subscribe ssc masters for regular update for ssc cgl preparation. Leave you reviews about SSC Masters in the comment box below and suggestions for ssc masters for innovative SSC CGL preparation.

JPSC Notes brings Prelims and Mains programs for JPSC Prelims and JPSC Mains Exam preparation. Various Programs initiated by JPSC Notes are as follows:- For any doubt, Just leave us a Chat or Fill us a querry––
JPSC Prelims and Mains Guidence